Silicon AFM probes, Tap 300
The Tap300 series are silicon AFM tapping mode probes. Made of monolithic silicon fitting most commercial AFM's, compatible with DI Nanoscope, PSI, JEOL, NT-MDT, Asylum, VEECO, WiTec and other commercial AFM's. The AFM cantilever and tip are micromachined with excellent uniformity and a sharp tip radius for high quality imaging. They feature alignment grooves for correct holding and calibration of probes (alignment grooves do not affect the AFM probe in systems that do not require this feature).
See images for AFM probe coatings and application information.
Technical Data: Tap300 Probes
- Rotated monolithic silicon probe
- Symmetric tip shape
- Alignment grooves
- Chip size 3.4 x 1.6 x 0.3mm
Value | Range | |
Resonant Freq. | 300kHz | ±10kHz |
Force Constant | 40N/m | 20-75N/m |
Length | 125µm | ±10µm |
Mean Width | 30µm | ±5µm |
Thickness | 4µm |
±1µm |
Tip Height | 17µm |
±2µm |
Tip Set Back | 15µm |
±5µm |
Tip Radius | <10 nm (G, AL-G, GD-G) <25nm (Electri) <15nm (DLC) |
|
Half Cone Angle | 20°-25° along cantilever axis 25°-30° from side 10°-at the apex |
Code | Coating | Pack Size | Availability | Price | Updated: 25-08-2025 |
---|---|---|---|---|---|
GTPTAP300AL-G-10 | Aluminium reflex coating | Pack/10 | 0 in stock (?) | P.O.R. | Quote |
GTPTAP300AL-G-50 | Aluminium reflex coating | Pack/50 | 0 in stock (?) | P.O.R. | Quote |
GTPTAP300AL-G-W | Aluminium reflex coating | Pack/380 | 0 in stock (?) | P.O.R. | Quote |
GTPTAP300DLC-10 | DLC coating | Pack/10 | 0 in stock (?) | P.O.R. | Quote |
GTPTAP300DLC-50 | DLC coating | Pack/50 | 0 in stock (?) | P.O.R. | Quote |
GTPTAP300E-G-10 | Conductive Cr/Pt Coating | Pack/10 | 0 in stock (?) | P.O.R. | Quote |
GTPTAP300E-G-50 | Conductive Cr/Pt Coating | Pack/50 | 0 in stock (?) | P.O.R. | Quote |
GTPTAP300-G-10 | None | Pack/10 | 0 in stock (?) | P.O.R. | Quote |
GTPTAP300-G-50 | None | Pack/50 | 0 in stock (?) | P.O.R. | Quote |
GTPTAP300GB-G-10 | Overall Au coating | Pack/10 | 0 in stock (?) | P.O.R. | Quote |
GTPTAP300GB-G-50 | Overall Au coating | Pack/50 | 0 in stock (?) | P.O.R. | Quote |
GTPTAP300-G-W | None | Pack/380 | 0 in stock (?) | P.O.R. | Quote |
PELTAP300GD-G-10 | Part Au coating | Pack/10 | 0 in stock (?) | P.O.R. | Quote |
PELTAP300GD-G-50 | Part Au coating | Pack/50 | 0 in stock (?) | P.O.R. | Quote |
* Ordering Schedule
This item is available for back-order where 0 stock is listed.
We order from this manufacturer weekly, with an estimated lead time of 6 weeks.
This is the estimated lead time, based on the average time taken previously to fill orders from this particular supplier.
Lead times are from when we receive your order until when we fill your order. For delivery times, please see shipping information below.