PELCO FIB lift-out TEM grids and half grids
The PELCO FIB Lift-Out TEM Grids fit in all standard TEM holders providing access, flexibility and full view of the lamella attached to posts. Designed for in-situ lift to attach the TEM lamellas milled out by SEM/FIB or FIB systems.
Copper:
Typical thickness is 35µm ±5µm, thinner ridge on the inside, where the lamellas can be attached and are protected when stored. Size of wide post - 250 x 35 (W x D), 190µm or 55µm thick. Size of narrow post - 80 x 35 (W x D), 190µm thick.
Molybdenum:
Typical thickness is 50µm ±5µm. Size of wide post - 250 x 50 (W x D), 190µm thick.
Silicon:
Typical thickness is 100µm. Debris-free, metal-free lift-out grids which readily bond with Pt to attach the lamellas. B-doped, conductive silicon minimises charging during sample preparation and TEM imaging. Size of narrow post - 80 x 100 (W x D), 190µm thick (can be shaped if needed)
Copper Beryllium:
Stiff, with a thickness of 100µm, diameter 3mm with a height of 1.5mm. Slot is 2mm wide x 0.5mm deep. Easy handling and good protection for the TEM lamellas with two dots on one side for easy identification.
Code | Title | Material | Size | Pack Size | Availability | Price | Updated: 22-01-2025 |
---|---|---|---|---|---|---|---|
GF301-CU1 | PELCO FIB lift-out TEM grids and half grids | Copper | 1 wide post, 190μm thick | Pack/100 | 3 weeks | $166.00 AUD | |
GF301-CU2 | PELCO FIB lift-out TEM grids and half grids | Copper | 2 wide posts, 190μm thick | Pack/100 | 3 weeks | $175.00 AUD | |
GF301-CU4 | PELCO FIB lift-out TEM grids and half grids | Copper | 4 narrow posts, 190μm thick | Pack/100 | 3 weeks | $185.00 AUD | |
GF301-MO2 | PELCO FIB lift-out TEM grids and half grids | Molybdenum | 2 wide posts, 190μm thick | Pack/25 | 3 weeks | $258.00 AUD | |
GF301-SI4 | PELCO FIB lift-out TEM grids and half grids | Silicon | 4 narrow posts, 190μm thick | Pack/10 | 3 weeks | $364.00 AUD | |
GF302 | PELCO FIB lift-out TEM grids and half grids | Copper/beryllium | Half grid | Pack/25 | 3 weeks | $58.00 AUD | |
GTP10GC02T | PELCO FIB lift-out TEM grids and half grids | Copper | 1 wide post, 55μm thick | Pack/100 | 3 weeks | $168.00 AUD | |
GTP4510-HALF | PELCO FIB lift-out TEM grids and half grids | Copper Beryllium | Half Grid | Pack/25 | 3 weeks | $56.00 AUD |
* Availability Explanation
X weeks – the estimated lead time, based on the average time taken previously to fill orders from this particular supplier. Lead times are from when we receive your order until when we fill your order. For delivery times, please see shipping information below.
In Stock – Plenty of stock on the shelf, ready to ship.
No ETA – our supplier has advised they cannot provide an accurate ETA. Generally there is some issue with supply, and it may be more than 6 months.