PELCO FIB lift-out TEM grids and half grids

The PELCO FIB Lift-Out TEM Grids fit in all standard TEM holders providing access, flexibility and full view of the lamella attached to posts. Designed for in-situ lift to attach the TEM lamellas milled out by SEM/FIB or FIB systems. 

Copper: 

Typical thickness is 35?m ?5?m, thinner ridge on the inside, where the lamellas can be attached and are protected when stored. Size of wide post - 250 x 35 (W x D), 190?m or 55?m thick. Size of narrow post - 80 x 35 (W x D), 190?m thick.

Molybdenum:

Typical thickness is 50?m ?5?m.  Size of wide post - 250 x 50 (W x D), 190?m thick.

Silicon:

Typical thickness is 100?m. Debris-free, metal-free lift-out grids which readily bond with Pt to attach the lamellas. B-doped, conductive silicon minimises charging during sample preparation and TEM imaging. Size of narrow post - 80 x 100 (W x D), 190?m thick (can be shaped if needed)

Copper Beryllium:

Stiff, with a thickness of 100?m, diameter 3mm with a height of 1.5mm. Slot is 2mm wide x 0.5mm deep. Easy handling and good protection for the TEM lamellas with two dots on one side for easy identification.

Updated: 04-12-2024
Code Title Material Size Pack Size Availability Price Updated: 04-12-2024
GF301-CU1 PELCO FIB lift-out TEM grids and half grids Copper 1 wide post, 190?m thick Pack/100 3 weeks $166.00 AUD
GF301-CU2 PELCO FIB lift-out TEM grids and half grids Copper 2 wide posts, 190?m thick Pack/100 3 weeks $175.00 AUD
GF301-CU4 PELCO FIB lift-out TEM grids and half grids Copper 4 narrow posts, 190?m thick Pack/100 3 weeks $185.00 AUD
GF301-MO2 PELCO FIB lift-out TEM grids and half grids Molybdenum 2 wide posts, 190?m thick Pack/25 3 weeks $258.00 AUD
GF301-SI4 PELCO FIB lift-out TEM grids and half grids Silicon 4 narrow posts, 190?m thick Pack/10 3 weeks $364.00 AUD
GF302 PELCO FIB lift-out TEM grids and half grids Copper/beryllium Half grid Pack/25 3 weeks $58.00 AUD
GTP10GC02T PELCO FIB lift-out TEM grids and half grids Copper 1 wide post, 55?m thick Pack/100 3 weeks $168.00 AUD
GTP4510-HALF PELCO FIB lift-out TEM grids and half grids Copper Beryllium Half Grid Pack/25 3 weeks $56.00 AUD

* Availability Explanation

X weeks – the estimated lead time, based on the average time taken previously to fill orders from this particular supplier. Lead times are from when we receive your order until when we fill your order. For delivery times, please see shipping information below.

In Stock – Plenty of stock on the shelf, ready to ship.

No ETA – our supplier has advised they cannot provide an accurate ETA. Generally there is some issue with supply, and it may be more than 6 months.