- Collections
Omniprobe lift-out grids and half grids
The Omniprobe Lift-Out Grids fit standard TEM holders and have a typical thickness of 25-30?m with a diameter of 3mm. Specifically designed to accept the TEM lamellas milled out by FIB or SEM/FIB systems with optimum access and a non-obscured view of the thin sections attached to the posts. Multiple indexed mounting positions for easy identification and positioning in the TEM.
Available:
Copper (3, 4 and 5 posts)
Molybdenum (3 posts)
Beryllium half ring
Code | Title | Material | Size | Pack Size | Availability | Price | Updated: 03-01-2025 |
---|---|---|---|---|---|---|---|
GF303-CU3 | Omniprobe lift-out grids and half grids | Copper | 3 posts | Pack/100 | 3 weeks | $494.00 AUD | |
GF303-CU3SA | Omniprobe lift-out grids and half grids | Copper | 3 posts, side access | Pack/100 | 3 weeks | $345.00 AUD | |
GF303-CU3SD | Omniprobe lift-out grids and half grids | Copper | 3 posts, shallow downset | Pack/100 | 3 weeks | $348.00 AUD | |
GF303-CU4 | Omniprobe lift-out grids and half grids | Copper | 4 posts | Pack/100 | 3 weeks | $494.00 AUD | |
GF303-CU5 | Omniprobe lift-out grids and half grids | Copper | 5 posts | Pack/100 | 3 weeks | $542.00 AUD | |
GF303-MO3 | Omniprobe lift-out grids and half grids | Molybdenum | 3 posts | Pack/25 | 3 weeks | $732.00 AUD | |
GF304 | Omniprobe lift-out grids and half grids | Beryllium | Half ring grid | Pack/10 | 3 weeks | $1,403.00 AUD |
* Availability Explanation
X weeks – the estimated lead time, based on the average time taken previously to fill orders from this particular supplier. Lead times are from when we receive your order until when we fill your order. For delivery times, please see shipping information below.
In Stock – Plenty of stock on the shelf, ready to ship.
No ETA – our supplier has advised they cannot provide an accurate ETA. Generally there is some issue with supply, and it may be more than 6 months.