PELCO X-CHECKER EXTRA SEM calibration x-ray references

PELCO X-CHECKER EXTRA SEM calibration x-ray references - Monitor Energy Dispersive Spectrometer/SEM SystemsThe updated PELCO X-CHECKER is a calibration aid to help you monitor the performance of your EDS X-ray system on an SEM. It contains a series of standard materials on your choice of aluminium mount, to check detector resolution and calibration, test for contamination on the detector window, monitor low-end sensitivity, and calibrate your image analysis software.Includes:EDS performance monitor contains the same elements as the PELCO X-CHECKER B plus a fluorine source, in the form of PTFE, to test resolution at the fluorine K-alpha peak (industry standard for measuring low end resolution). A beryllium half grid is also added for ultimate test of low end detector performance. Instruction booklet and storage case included.SEM mount selections Type A-R:

PELCO X-CHECKER EXTRA SEM calibration x-ray references - Monitor Energy Dispersive Spectrometer/SEM Systems

The updated PELCO X-CHECKER is a calibration aid to help you monitor the performance of your EDS X-ray system on an SEM. It contains a series of standard materials on your choice of aluminium mount, to check detector resolution and calibration, test for contamination on the detector window, monitor low-end sensitivity, and calibrate your image analysis software.

Includes:

  • EDS performance monitor contains the same elements as the PELCO X-CHECKER B plus a fluorine source, in the form of PTFE, to test resolution at the fluorine K-alpha peak (industry standard for measuring low end resolution). A beryllium half grid is also added for ultimate test of low end detector performance. 
  • Instruction booklet and storage case included.

SEM mount selections Type A-R: Technical Data

MSDS

Updated: 03-04-2025
Code Mount Pack Size Availability Price Updated: 03-04-2025
STP602-03 Unmounted Each 3 weeks P.O.R. Quote
STP602-03A Mount A Each 3 weeks P.O.R. Quote
STP602-03AFM Mount AFM Each 3 weeks P.O.R. Quote
STP602-03B Mount B Each 3 weeks P.O.R. Quote
STP602-03C Mount C Each 3 weeks P.O.R. Quote
STP602-03D Mount D Each 3 weeks P.O.R. Quote
STP602-03E Mount E Each 3 weeks P.O.R. Quote
STP602-03F Mount F Each 3 weeks P.O.R. Quote
STP602-03G Mount G, custom Each 3 weeks P.O.R. Quote
STP602-03K Mount K Each 3 weeks P.O.R. Quote
STP602-03L Mount L Each 3 weeks P.O.R. Quote
STP602-03M Mount M Each 3 weeks P.O.R. Quote
STP602-03O Mount O Each 3 weeks P.O.R. Quote
STP602-03P Mount P Each 3 weeks P.O.R. Quote
STP602-03Q Mount Q Each 3 weeks P.O.R. Quote
STP602-03R Mount R Each 3 weeks P.O.R. Quote
STP602-03S Mount S Each 3 weeks P.O.R. Quote

* Availability Explanation

X weeks – the estimated lead time, based on the average time taken previously to fill orders from this particular supplier. Lead times are from when we receive your order until when we fill your order. For delivery times, please see shipping information below.

In Stock – Plenty of stock on the shelf, ready to ship.

No ETA – our supplier has advised they cannot provide an accurate ETA. Generally there is some issue with supply, and it may be more than 6 months.