NW/KF hose adapters (weld flange), aluminium

The NW/KF hose adapters and made solid bar aluminium, no welds. These hose adapters have several names flat flanges, terminal pad, half nipple, weld flange, tubulations, and flange coupling.Specifications:

The NW/KF hose adapters and made solid bar aluminium, no welds. These hose adapters have several names flat flanges, terminal pad, half nipple, weld flange, tubulations, and flange coupling.

Specifications:

Product Adapter Size Dimensions

NW/KF16
VTP92410-1638
9.53mm
A=12mm, B=44mm
VTP92410-1650
12.7mm or 15.88mm
A=16mm, B=42mm
VTP92410-1675
15.88mm or 19mm
A=19mm, B=42mm

NW/KF25
VTP92410-2538
9.53mm
A=12mm, B=44mm
VTP92410-2550
12.7mm or 15.88mm
A=16mm, B=42mm
VTP92410-2575
15.88mm or 19mm
A=19mm, B=42mm
VTP92410-2500
19mm or 22.23mm
A=22.5mm, B=44mm

NW/KF40
VTP92410-40
38.1mm or 41.28mm
A=41.5mm, B=55mm

NW/KF50
VTP92410-50
38.1mm or 41.28mm
A=41.5mm, B=55mm

Vacuum Flange Types and Sizes

Updated: 22-01-2025
Code Title Size Hose Pack Size Availability Price Updated: 22-01-2025
VTP92410-1638 NW/KF hose adapters (weld flange), aluminium NW/KF16 9.53mm Each 3 weeks $52.00 AUD
VTP92410-1650 NW/KF hose adapters (weld flange), aluminium NW/KF16 12.7mm or 15.88mm Each 3 weeks $46.00 AUD
VTP92410-1675 NW/KF hose adapters (weld flange), aluminium NW/KF16 15.88mm or 19mm Each 3 weeks $46.00 AUD
VTP92410-2500 NW/KF hose adapters (weld flange), aluminium NW/KF25 19mm or 22.23mm Each 3 weeks $43.00 AUD
VTP92410-2538 NW/KF hose adapters (weld flange), aluminium NW/KF25 9.53mm Each 3 weeks $47.00 AUD
VTP92410-2550 NW/KF hose adapters (weld flange), aluminium NW/KF25 12.7mm or 15.88mm Each 3 weeks $54.00 AUD
VTP92410-2575 NW/KF hose adapters (weld flange), aluminium NW/KF25 15.88mm or 19.05mm Each 3 weeks $57.00 AUD
VTP92410-40 NW/KF hose adapters (weld flange), aluminium NW/KF40 38.1mm or 41.28mm Each 3 weeks $56.00 AUD
VTP92410-50 NW/KF hose adapters (weld flange), aluminium NW/KF50 38.1mm or 41.28mm Each 3 weeks $60.00 AUD

* Availability Explanation

X weeks – the estimated lead time, based on the average time taken previously to fill orders from this particular supplier. Lead times are from when we receive your order until when we fill your order. For delivery times, please see shipping information below.

In Stock – Plenty of stock on the shelf, ready to ship.

No ETA – our supplier has advised they cannot provide an accurate ETA. Generally there is some issue with supply, and it may be more than 6 months.