
- Collections
PELCO X-CHECKER B SEM calibration x-ray references
PELCO X-CHECKER B SEM calibration x-ray references - Monitor Energy Dispersive Spectrometer/SEM Systems.
The updated PELCO X-CHECKER is a calibration aid to help you monitor the performance of your EDS X-ray system on an SEM. It contains a series of standard materials on your choice of aluminium mount, to check detector resolution and calibration, test for contamination on the detector window, monitor low-end sensitivity, and calibrate your image analysis software.
Includes:
- The addition of a boron nitride sample to the PELCO X-Checker B, provides a more sensitive monitor of low end performance on thin window and windowless detectors.
- Instruction booklet and storage case included.
SEM mount selections Type A-R: Technical Data
Code | Mount | Pack Size | Availability | Price | Updated: 15-09-2025 |
---|---|---|---|---|---|
STP602-02 | Unmounted | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02A | Mount A | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02AFM | Mount AFM | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02B | Mount B | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02C | Mount C | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02D | Mount D | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02E | Mount E | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02F | Mount F | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02G | Mount G, custom | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02K | Mount K | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02L | Mount L | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02M | Mount M | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02O | Mount O | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02P | Mount P | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02Q | Mount Q | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02R | Mount R | Each | 0 in stock (?) | P.O.R. | Quote |
STP602-02S | Mount S | Each | 0 in stock (?) | P.O.R. | Quote |
* Ordering Schedule
This item is available for back-order where 0 stock is listed.
We order from this manufacturer weekly, with an estimated lead time of 3 weeks.
This is the estimated lead time, based on the average time taken previously to fill orders from this particular supplier.
Lead times are from when we receive your order until when we fill your order. For delivery times, please see shipping information below.