PELCO X-CHECKER EXTRA SEM calibration x-ray references

PELCO X-CHECKER EXTRA SEM calibration x-ray references - Monitor Energy Dispersive Spectrometer/SEM SystemsThe updated PELCO X-CHECKER is a calibration aid to help you monitor the performance of your EDS X-ray system on an SEM. It contains a series of standard materials on your choice of aluminium mount, to check detector resolution and calibration, test for contamination on the detector window, monitor low-end sensitivity, and calibrate your image analysis software.Includes:EDS performance monitor contains the same elements as the PELCO X-CHECKER B plus a fluorine source, in the form of PTFE, to test resolution at the fluorine K-alpha peak (industry standard for measuring low end resolution). A beryllium half grid is also added for ultimate test of low end detector performance. Instruction booklet and storage case included.SEM mount selections Type A-R:

PELCO X-CHECKER EXTRA SEM calibration x-ray references - Monitor Energy Dispersive Spectrometer/SEM Systems

The updated PELCO X-CHECKER is a calibration aid to help you monitor the performance of your EDS X-ray system on an SEM. It contains a series of standard materials on your choice of aluminium mount, to check detector resolution and calibration, test for contamination on the detector window, monitor low-end sensitivity, and calibrate your image analysis software.

Includes:

  • EDS performance monitor contains the same elements as the PELCO X-CHECKER B plus a fluorine source, in the form of PTFE, to test resolution at the fluorine K-alpha peak (industry standard for measuring low end resolution). A beryllium half grid is also added for ultimate test of low end detector performance. 
  • Instruction booklet and storage case included.

SEM mount selections Type A-R: Technical Data

MSDS

Updated: 23-02-2025
Code Title Mount Pack Size Availability Price Updated: 23-02-2025
STP602-03 PELCO X-CHECKER EXTRA SEM calibration x-ray references Unmounted Each 3 weeks P.O.R. Quote
STP602-03A PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount A Each 3 weeks P.O.R. Quote
STP602-03AFM PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount AFM Each 3 weeks P.O.R. Quote
STP602-03B PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount B Each 3 weeks P.O.R. Quote
STP602-03C PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount C Each 3 weeks P.O.R. Quote
STP602-03D PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount D Each 3 weeks P.O.R. Quote
STP602-03E PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount E Each 3 weeks P.O.R. Quote
STP602-03F PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount F Each 3 weeks P.O.R. Quote
STP602-03G PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount G, custom Each 3 weeks P.O.R. Quote
STP602-03K PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount K Each 3 weeks P.O.R. Quote
STP602-03L PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount L Each 3 weeks P.O.R. Quote
STP602-03M PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount M Each 3 weeks P.O.R. Quote
STP602-03O PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount O Each 3 weeks P.O.R. Quote
STP602-03P PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount P Each 3 weeks P.O.R. Quote
STP602-03Q PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount Q Each 3 weeks P.O.R. Quote
STP602-03R PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount R Each 3 weeks P.O.R. Quote
STP602-03S PELCO X-CHECKER EXTRA SEM calibration x-ray references Mount S Each 3 weeks P.O.R. Quote

* Availability Explanation

X weeks – the estimated lead time, based on the average time taken previously to fill orders from this particular supplier. Lead times are from when we receive your order until when we fill your order. For delivery times, please see shipping information below.

In Stock – Plenty of stock on the shelf, ready to ship.

No ETA – our supplier has advised they cannot provide an accurate ETA. Generally there is some issue with supply, and it may be more than 6 months.